Every Nanometer
Spoken For.
Millisecond-precise scheduling across 300mm lines, etch bays, and lithography queues. The capacity calculator below is live — touch it before you read another word.
Process Node
5nm FinFET
Wafer Starts
5,000wsmEst. Cost
$84.0M
@ $16,800/wafer
Lead Time
21 weeks● Filling fast
← adjust volume to unlock reservation
Available Wafer Starts by Quarter
Fab Lines
14
active
Utilization
104%
avg
Next Slot
Q2 '26
5nm
Interlocked at the
Chamber Level.
Every booking is validated against shared equipment availability across etch, deposition, and lithography — simultaneously. Hover a block to inspect the lot.
Drag a lot.
Watch time cascade.
Priority changes propagate instantly across every downstream operation. Move a Tier 1 lot above a Tier 3 and watch projected dates recalculate in real time — the same engine that runs at 3 a.m. in the fab.
Tier 1 — Automotive OEM
Guaranteed starts, 0-flex window
Tier 2 — Fabless Priority
Tape-out locked, ±2 day flex
Tier 3 — Flex Capacity
Fill slots, moveable up to 14 days
Active Queue — 300mm Line B
NovaTech Semi
5nm · 2,400 wsm
Axiom Logic
5nm · 1,800 wsm
Crestline Auto
7nm · 3,200 wsm
Luminary IC
7nm · 900 wsm
Sigma Fab
28nm · 5,600 wsm
Drag rows to reorder priority — dates cascade automatically
300mm
Wafer Lines
TSMC · Samsung · GF
14
Active Fabs
Real-time sync
< 80ms
Booking Latency
Conflict detection
6 qtrs
Forward Visibility
OEM planning horizon
The glass is one click thick.
Everything you saw above — the utilization curves, the Gantt engine, the cascade logic — is live inside the platform. Your tape-out slot is waiting. The queue does not hold.
Trusted by operations teams at